In this proposed rule, the Rural Utilities Service seeks to streamline requirements for borrowers by eliminating regulations on Exceptions of RUS Operational Controls. The exemptions being removed from RUS Operational Controls are now afforded by way of

In this proposed rule, the Rural Utilities Service seeks to streamline requirements for borrowers by eliminating regulations on Exceptions of RUS Operational Controls. The exemptions being removed from RUS Operational Controls are now afforded by way of

Action
Published Date
Code CFR
7 CFR Part 1710 and 1717
Department
Pages
36542-36544
Volume Number
67